Electricity – the limited resource
The camp takes place on an area which does not provide a sufficient amount of electricity to cover our needs. …
The camp takes place on an area which does not provide a sufficient amount of electricity to cover our needs. …
German summary: Unbedingt Mehrfachsteckdosen mitbringen! Außerdem: Cat5-Kabel, Lampen für Eure Assembly, Telefone, Werkzeug, etc…
Distributing power on 30C3 requires a lot of planning and effort, and of course a truckload of equipment. This year the setup consists of 5 kilometers (km) of CEE compliant three-phase and 8km of 230V/16A power cabling, resulting in a total of 13km of cables needed to distribute power at the venue. To connect all the cables there are also about 100 three-phase distributors needed, 25 of them being “big” ones with 63 amperes. On top of this power backbone we will …